10 links · France, Netherlands, Belgium, Denmark, Norway & Ireland
Imports % of grid
12.8%
From live Carbon Intensity API (cross-check)
IFA (France)
Interconnexion France-Angleterre · HVDC
↓ Importing 844 MW
2.0 GW max capacity · 42% utilised
IFA2 (France)
Normandy to Fareham · opened 2021
↓ Importing 364 MW
1.0 GW max capacity · 36% utilised
Eleclink (France)
Via the Channel Tunnel · opened 2022
↓ Importing 372 MW
1.0 GW max capacity · 37% utilised
BritNed (Netherlands)
Isle of Grain to Maasvlakte
↓ Importing 658 MW
1.0 GW max capacity · 66% utilised
Nemo (Belgium)
Richborough to Herdersbrug
↓ Importing 568 MW
1.0 GW max capacity · 57% utilised
Viking (Denmark)
Bicker Fen to Revsing · opened 2023
↓ Importing 654 MW
1.4 GW max capacity · 47% utilised
NSL (Norway)
Blyth to Kvilldal · Norwegian hydro
↓ Importing 0 MW
1.4 GW max capacity · 0% utilised
Moyle (N. Ireland)
Auchencrosh to Ballycronan More
↑ Exporting 402 MW
500 MW max capacity · 80% utilised
East-West (Ireland)
Rush, Co. Dublin to Deeside, Wales
↑ Exporting 198 MW
500 MW max capacity · 40% utilised
Greenlink (Ireland)
Pembrokeshire to Wexford · opened 2024
↑ Exporting 314 MW
700 MW max capacity · 45% utilised
🔵 Importing into GB · 🟠 Exporting from GB — real, directly-metered flow per link from Elexon (generation/outturn/interconnectors), updated each settlement period (~every 30 min).
"Imports % of grid" above is a separate live figure from the Carbon Intensity API's blended generation mix, kept here as a rough cross-check against the per-link total.
Ofgem price cap — Q3 2026
Annual cap (typical household)
£1,862
1 Jul – 30 Sep 2026 · up 13% from Q2
Electricity unit rate
26.11p/kWh
Standing charge: 57.19p/day
Gas unit rate
7.33p/kWh
Standing charge: 29.04p/day
Q4 announcement in
1 days
26 Aug 2026 · covers Oct–Dec 2026
Cap expires in
36 days
30 Sep 2026
Q4 forecast direction
▲ Higher
Middle East tensions still pushing wholesale up
Ofgem sets the cap quarterly · next review 26 Aug · new cap starts 1 Oct 2026 · applies to standard variable tariffs only · update unit rates each quarter in the PHP.
Grid-scale battery storage — BESS
Trading / mixed
System price £109/MWh — mid-range, dispatch varies by site strategy
6.9 GW
12,900 MWh total · end 2025
System price now
£109/MWh
Live · Elexon settlement price · 00:00
Operational capacity
12,900 MWh
+45% growth in 2025
Power output
6.9 GW
Instantaneous discharge capacity
Response time
<1 second
vs 16 sec for Dinorwig pumped storage
Needed by 2030
23–27 GW
Clean Power 2030 target · vs 6.9 GW today
Minety
Wiltshire
Power150 MW
Storage150 MWh
OwnerShell Energy / China Huaneng
Li-ion
Pillswood
East Yorkshire
Power98 MW
Storage196 MWh
OwnerHarmony Energy
Tesla Megapack
Capenhurst
Cheshire
Power100 MW
Storage100 MWh
OwnerGresham House
Li-ion
Gateway Energy Centre
Essex
Power450 MW
Storage900 MWh
OwnerAmp Energy
Li-ion
Kincardine
Aberdeenshire
Power400 MW
Storage800 MWh
OwnerAmp Energy
Li-ion
Trafford (planned)
Manchester
Power1040 MW
Storage2080 MWh
OwnerCarlton Power
Li-ionplanned
Pembroke (planned)
South Wales
Power350 MW
Storage700 MWh
OwnerRWE
Li-ionplanned
UK operational BESS: 12.9 GWh / 6.9 GW as of end 2025 · Source: Energy Storage News · 2030 target from Elexon (Jun 2026) · Charging/discharging status inferred from the live GB system price (Elexon settlement price, updated each settlement period) — individual battery sites are metered BM Units but aren't exposed as a public per-site live feed, so this is a fleet-wide read rather than "Minety is charging right now."
Pumped storage — the grid's gravity battery
Standby / mixed
System price £109/MWh — mid-range, status varies by site and reservoir level
2.83 GW
total UK capacity · 24.3 GWh storage
Dinorwig
Snowdonia, Wales · Built 1984
Max output1.73 GW
Storage9.1 GWh
Response time16 seconds
💧 Built to handle the TV pickup — can power 1.7m homes instantly
Cruachan
Argyll, Scotland · Built 1965
Max output0.44 GW
Storage7.1 GWh
Response time30 seconds
💧 Known as "the hollow mountain" — open for public tours
Ffestiniog
Snowdonia, Wales · Built 1963
Max output0.36 GW
Storage1.8 GWh
Response time60 seconds
💧 Oldest pumped storage in the UK — still going strong
Foyers
Inverness-shire, Scotland · Built 1975
Max output0.3 GW
Storage6.3 GWh
Response time60 seconds
💧 Originally built to power an aluminium smelter
System price now
£109/MWh
Live · Elexon settlement price · 00:00
Total capacity
2.83 GW
All 4 operational sites
Total storage
24.3 GWh
Combined reservoir capacity
Fastest response
16 seconds
Dinorwig — standby to full power
Pipeline capacity
2.55 GW
New projects consented/planned
New pumped storage — in the pipeline
Coire Glas
Consented — awaiting FID
Capacity1.5 GW
Storage30 GWh
OwnerSSE Renewables
Would be UK's largest ever pumped storage — 1.5 GW for 20 hours
Red John
Consented 2024
Capacity0.45 GW
Storage10.8 GWh
OwnerStatera Energy
Near Loch Ness — upper reservoir on hillside above loch
Loch na Cathrach
In development
Capacity0.6 GW
Storage12 GWh
OwnerDrax Group
Near existing Cruachan site — benefits from existing grid connection
Charging/discharging status inferred from the live GB system price (same signal used for battery storage above) — not directly metered per site. Pumped storage counted within hydro % in Carbon Intensity API. Efficiency ~75-80%.
100 × Siemens Gamesa 14MW turbines fully installed (Jun 2026) · connecting to HVDC system in phases · full 1.4GW targeted by end 2026 · powers ~1.2m homes
Culzean floating offshore
Firth of Clyde, Scotland
Capacity0.003 GW
ExpectedSummer 2026
OwnerTotalEnergies
Single 3MW floating pilot turbine · powers ~20% of the Culzean gas platform's own load, not exported to the public grid · first new UK floating wind since Kincardine (2021)
Hornsea 3 offshore
North Sea (Yorkshire)
Capacity2.85 GW
ExpectedUnder construction — 2027
OwnerØrsted
2.85 GW when complete · first export cable connected to shore Mar 2026 · Will be world's largest single wind farm · 231 turbines
Pipeline projects subject to construction timelines, grid connection availability and final investment decisions. Solar capacity factor ~11% UK annual average · peak sunny day ~60-70% of rated.